Bottleneck findings
- Most constraining step: Reel slitting (holds up 4 steps).
- For the scenario: none stops none.
Executive Intelligence · Operations and Transformation
Shows where work waits (review queues, overdue approvals) from recorded timestamps.
Demonstration: Fernhill Packaging Ltd (fictional) · Manufacturing. Fictional data and a scripted answer.
Where is the bottleneck in our end-to-end process, and what does a stoppage there hold up?
Fail one or more items and see what stops and what only degrades, worked out by following the dependencies.
Choose what stops or runs at a crawl. Hard dependencies stop with it; soft ones carry on, degraded.
Simulated answer. Written for this fictional case, not produced by a live model. Only the figures in it are computed, from what you decided above.
Following the flow, a stoppage at none stops none and degrades none [S1][S2]. The step whose stoppage holds up the most is Reel slitting, which holds up 4 others.
Every line has spare capacity on paper, yet output is capped because every box must pass through the single die-cutting machine. The bottleneck is the step with one machine and no alternative, not the one that looks busiest.
Relies on: S1 · End-to-end process mapS2 · Step capacity measurements
The operations director decides. Approving sets the order in which bottleneck relief is investigated. It does not buy equipment or change a schedule.
Not ready to approve. Fail at least one item first, to see what depends on it.
In the product this is a different person with the right permission. Here you play that role to see the rule.
The Executive Intelligence story · This capability in the full register